Hotel Santa Anna l´Estartit

BEFORE:

antes_santaana_altbath

A clear example of the Altbath Box system.
Altbath moves away from the traditional artisan style, instead opting for the installation of its pre-industrialised module system.
Our team of engineers have developed a group of special materials for use in the manufacture of bathroom construction elements.
This strong and shock-resistant material, is pleasant to the touch, robust and fully customisable.
This Costa Brava hotel performed a total overhaul of its installations, removing the baths with a minimum amount of work and in record time.
All of this was possible thanks to our Box modular system that allowed the installation of a full bathroom in 24 hours without taking away from the design.

Date

1 September, 2015

Category

Hotel

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.plugin cookies

ACEPTAR
Aviso de cookies